Sharp Grossmont Hospital Imaging Equipment

This project was a renovation within an existing, operational, acute-care hospital to remodel two existing X-ray rooms, totaling approximately 780 SF to support the installation of new GE Imaging Equipment. The project was completed in two separate phases so that the Hospital maintained the use of one X-ray room at all times during the renovation. The project area was located directly above the Sterile Processing Department (SPD) and directly below the Surgery Department with multiple active Operating Rooms. Measures to minimize disruption to the normal operations of these critical hospital functions were implemented.

Architect

TAYLOR

Square Footage

780

Market

Healthcare